PEEL RIVER TO RUN DRY AS TEMPORARY WEIR IS BUILT

The Peel River will soon stop flowing after a new weir was launched in Dungowan today.

It’s first phase of critical drought infrastructure set to extend Tamworth’s water supply to 2021.

text will be replaced